DAT Supply Nutraceutical manufacturing
Operations

Private Label Gummy Launch Checklist (EU)

5 April 2026 · 8 min read

Most first-time gummy launches lose 4–8 weeks to predictable, avoidable mistakes. This is the eleven-step checklist we wish every new private label brand had on day one.

  • Define the SKU positioning before the formula
  • Confirm target market(s) early — EU labelling differs from UK and US
  • Pick a category-leading active list, not a wishlist
  • Lock the EU permitted claims you will use on pack
  • Choose pectin vs gelatin (we default to pectin)
  • Choose packaging — HDPE jar vs doypack vs blister
  • Brief the artwork team with the dieline early
  • Confirm MOQ tier (1000 / 2500 / 5000+)
  • Schedule lab testing in parallel with production
  • Plan customs and EU duty pre-clearance
  • Build a launch stock buffer — we recommend 20% of month-1 forecast

The earlier you lock 1–4, the faster the rest moves.

Products mentioned

Working on a private label gummy launch?

Get a tailored formulation proposal in one working day.